The September 2025 update for ePROMIS FutureGen Enterprise Cloud introduces significant improvements across project management, purchasing, treasury, accounting, QHSE, and setup controls. These enhancements focus on compliance, transparency, and operational accuracy, providing enterprises with greater confidence in their financials, procurement, and subcontractor management processes.
Project & Subcontractor Management1
- Scope of Work MRQ Status
Subcontractor scope of work now includes MRQ Status, aligning with requisition functionality for better status tracking.
Financial Reporting & Treasury2
- Report Comments
Add Financial Notes to P&L and Balance Sheet reports for clearer contextual reporting.
- LC Register Popup
Double-click on bill reference number to view linked bills booked against the same PO number.
Setup & Workflow Controls4
- Mandatory Fields in Job Allocation Setup ID 834
Quantity and rate fields are now compulsory in Job Allocation.
- Type-Wise Filtering in Petty Cash Setup ID 837
Introduced type filters for petty cash, with user-level filtering available in User → Accounts → Petty Cash Type.
- ZATCA Compliance Control
In Company Master, a ‘Yes/No’ option can mark ZATCA applicability. For applicable companies in region +966, relevant receivable postings will reflect in the system.
- Mismatch Account Posting Setup ID 839
Differences (excluding rounding) can now be posted automatically to a mismatch account.
Accounts & Location Controls2
- Location Tree Enhancements
Company and Non-Inventory tabs added in the Location Tree screen.
Non-inventory expense accounts can now be mapped at multiple levels (Item Master, Expense Details, or global “ALL” code fallback).
Inventory accounts are defined based on inventory type, ensuring correct posting logic for stock vs. non-stock items.
- Flying Supplier Master
Company-specific details for flying suppliers are now available and automatically reflected in related company records.
Purchasing Enhancements3
- PO Amendment History
Approval history is preserved even if the voucher is automatically reset after amendment.
- Controlled PO Re-Approval
Re-approval requests for amended POs must be initiated directly from the PO screen; the option is blocked in other areas.
- BID Summary ETA
Assign ETA dates per supplier in bid summary for improved procurement planning.
QHSE & Compliance1
- QHSE Tree Structure
A multi-level tree structure is introduced for entering and managing QHSE types, improving compliance record management.
The September 2025 Cloud Update builds on ePROMIS’ mission of delivering accurate financials, streamlined procurement, and stronger compliance frameworks. With smarter subcontractor scope tracking, advanced PO handling, and flexible account controls, enterprises can manage projects and finances with enhanced visibility and accountability.